Consider accepting the Council Chamber Renovation Project and authorizing the commencement of the contractor's one-year maintenance period.
Staff Report & Agenda Item Details
This item accepts the Council Chamber Renovation Project (the "Project") and authorizes the commencement of Construction Masters of Houston, Inc. (the "Contractor") one-year maintenance period.<br><br>The scope of work related to the Project primarily focused on updating the Council Chamber's audiovisual technology, as the existing system is outdated and at its end of life. The upgrades include the following basework with the addition of three alternates:<br><br><table border="1" cellspacing="0" cellpadding="0" width="598" style="width:448.6pt;background:white;border-collapse:collapse;border:none;" id="isPasted"><thead><tr><td valign="bottom" style="width: 472px; border: 1pt solid windowtext; background: rgb(232, 232, 232); padding: 0in 5.4pt; height: 14.6pt; vertical-align: bottom;"><p style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;font-size:16px;font-family:"Aptos",sans-serif;text-align:center;'><strong><span style="color:black;">Summary</span></strong></p></td><td valign="bottom" style="width: 126px; border-top: 1pt solid windowtext; border-right: 1pt solid windowtext; border-bottom: 1pt solid windowtext; border-image: initial; border-left: none; background: rgb(232, 232, 232); padding: 0in 5.4pt; height: 14.6pt; vertical-align: bottom;"><p style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;font-size:16px;font-family:"Aptos",sans-serif;text-align:center;'><strong><span style="color:black;">Amount</span></strong></p></td></tr></thead><tbody><tr><td valign="bottom" style="width: 472px; border-right: 1pt solid windowtext; border-bottom: 1pt solid windowtext; border-left: 1pt solid windowtext; border-image: initial; border-top: none; background: rgb(192, 230, 245); padding: 0in 5.4pt; height: 14.6pt; vertical-align: bottom;"><p style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;font-size:16px;font-family:"Aptos",sans-serif;'><span style="color:black;">Base Bid</span></p></td><td valign="bottom" style="width: 126px; border-top: none; border-left: none; border-bottom: 1pt solid windowtext; border-right: 1pt solid windowtext; background: rgb(192, 230, 245); padding: 0in 5.4pt; height: 14.6pt; vertical-align: bottom;"><p style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;font-size:16px;font-family:"Aptos",sans-serif;'><span style="color:black;">$330,165.16</span></p></td></tr><tr><td valign="top" style="width: 472px; border-right: 1pt solid windowtext; border-bottom: 1pt solid windowtext; border-left: 1pt solid windowtext; border-image: initial; border-top: none; padding: 0in 5.4pt; height: 69.55pt; vertical-align: top;"><p style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;font-size:16px;font-family:"Aptos",sans-serif;'><span style="color:black;">Labor, materials, equipment, and supervision to renovate chambers per the drawings by Brinkley Wiginton Architects dated 02/26/2025. Includes all AV/IT design, engineering, fabrication