YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Back to Docket Search
3 • OperationsTimber Lane Utility District (Harris County)

3. The Board discussed the preliminary meeting held with the engineer and the

Presented in: Timber Lane Utility District Board Meeting - January 28, 2026 on 2026-01-28
Meeting Agenda PDF

Official Roll-Call Vote

Routine / Procedural • 0.0 Score Impact
PASSED (5 - 0)
“Board Action: 3. The Board discussed the preliminary meeting held with the engineer and the”
EL
Eric Langstaff
Director, Place 3
YES
DM
Daniel Meacham
Director, Place 4
YES
JM
James Messer
Director, Place 5
YES
AG
A.F. Gessel
Director, Place 1
YES
RS
Robert Schenck
Director, Place 2
YES

Staff Report & Agenda Item Details

North Harris County Regional Water Authority ("Authority"). The engineer for the Authority has indicated that there is a water line project two to three years in the future that will impact Timber Lane Park. The Authority's supply line would cross the park boundary and connect to the District's Ciderwood water plant. The District engineer indicated in the preliminary meeting that the Authority will be responsible for replacement of any trails in the District's park that are removed for the project. The Authority will also need to replace all the fences between the District's park and the neighboring property owners. The Authority will also need to fence off the area so that park users are not wandering into the construction site. The Authority will need access 94056-002 598175.1

Bastiat Liberty & Property Rights Analysis

This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.