YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Search RecordsFreedom Index
SubscribeLoading...
Back to Docket Search
5.AR • Action ItemsCARROLLTON-FARMERS BRANCH ISD (Dallas County)

Consider/Approve Extension of RFQ 2024-03-052 Professional Services for Construction Description: Priority #2: Optimize Facility, Safety & Security, and Infrastructure In parallel with construction and renovation projects, a multitude of services are performed by licensed professionals to ensure compliance with local, state, and federal building regulations.   With the volume of capital improvemen

Presented in: CARROLLTON-FARMERS BRANCH ISD Board of Trustees Regular Meeting on 2026-06-04
Meeting Agenda PDF

Official Roll-Call Vote

PASSED (7 - 0)
“Action on Consider/Approve Extension of RFQ 2024-03-052 Professional Services for Construction Description: Priority #2: Optimize Facility, Safety & Security, and Infrastructure In parallel with construction an”
MB
Marjorie Burns
Trustee, Place 5 (Place 5)
YES
IG
Ileana Garza-Rojas
Trustee, Place 6 (Place 6)
YES
CH
Cassandra Hatfield
Trustee, Place 7 (Place 7)
YES
RS
Randy Schackmann
Trustee, Place 1 (Place 1)
YES
TH
Tara Hrbacek
Trustee, Place 2 (Place 2)
YES
KB
Kim Brady
Trustee, Place 3 (Place 3)
YES
CB
Carolyn Benavides
Trustee, Place 4 (Place 4)
YES

Staff Report & Agenda Item Details

5.AR. Consider/Approve Extension of RFQ 2024-03-052 Professional Services for Construction Description: Priority #2: Optimize Facility, Safety & Security, and Infrastructure In parallel with construction and renovation projects, a multitude of services are performed by licensed professionals to ensure compliance with local, state, and federal building regulations.   With the volume of capital improvement projects steadily increasing throughout the District, it is anticipated that the dollars spent on these services, will increase as well.  A formal process was proactively conducted, ensuring contracts are established with firms that have demonstrated core qualifications at competitive rates. Award of these contracts will ensure that the District is receiving the best value for these services from the most qualified firms on capital improvement projects. As governed in Texas Government Code §2254.004, a Request for Qualifications (RFQ) was issued on March 27, 2024 to solicit Qualification Statements from firms to perform various services, as detailed and attached.  Eighteen (18) Qualification Statements were received in step one of this process, which were evaluated and ranked based on their submission.  District Administration determined that based on the number and variety of projects to be assigned, the District would be best served by selecting multiple firms to form a pool of qualified and competent firms that will be assigned projects based on each firm’s qualifications, competence, capabilities, design and programming approach. Extension #2 of 4. Recommendation: It is recommended that the Board of Trustees approves the extension of RFQ 2024-03-052 and the pool of firms to provide professional services for construction and renovation projects and to authorize the Superintendent or her designee to execute purchases and/or contracts in the best interest of the District. Attachments: ( 1 ) 2024-03-052 Professional Services for Construction - Submissions 5/28/2026 at 2:10 PM